Site visit
Access, constraints, and intent alignment.

Commercial design-build and AMC for hotels, campuses, developers, and institutions — nine accountable pillars from hardscape through maintenance. Pan-India where programme logistics allow; portfolio and BOQ discipline on every scope band.
Request a site assessmentService pillars
Each pillar maps to BOQ line items, commissioning steps, and handover deliverables — pick a discipline for specifications, not a generic brochure.

Hardscape & civil
Paving, retaining walls, steps, and civil integration with drainage.

Softscape & horticulture
Planting design, soil, turf, and horticulture to spec.

Irrigation & water management
Zones, controllers, drip and sprinkler systems, STP integration.

Landscape maintenance (AMC)
AMC programmes, seasonal tasks, and SLA-backed visits.

Terrace & podium gardens
Podium and rooftop gardens with waterproofing coordination.

Outdoor lighting
Pathway, feature, and façade lighting to specification.

Indoor plantation
Atrium and lobby planting, rental and replacement programmes.

Swimming pools
Pool surround hardscape, planting, and integration.

Water features
Fountains, rills, and water walls with MEP coordination.
Constraints
Service depth lives on each pillar page; these are the cross-cutting risks procurement teams ask about before mobilisation.
Finished levels, falls, and sub-base integration tied to hardscape scope — not left to the main civil contractor by default.
Zone layouts, controller programming, and STP or tank integration documented before establishment — see irrigation services.
Working campuses, hotel soft openings, and occupied podiums need hold points, access routes, and snag lists — not a single monsoon-blind pour.
Terrace gardens, pools, water features, and façade lighting require interface clarity with structure and MEP before planting or paving starts.
Process
One accountable path from survey through phased build, documentation, and optional landscape maintenance AMC.
Access, constraints, and intent alignment.
Quantities, risks, and programme reality.
BOQ-linked scope, exclusions, and milestones.
Contractual clarity on substitutions and hold points.
Phased execution with QA and documentation.
AMC handover with SLAs where contracted.
Proof
Named case studies and a commercial client roster sit on our projects hub. Architects can review coordination expectations on for architects. Specimen planting procurement routes through imported exotic trees where designs call for it.
View projectsGallery
Reference views of hardscape, horticulture, irrigation, and maintenance work on commercial programmes.
Procurement
Use calculators and guides for pre-qualification; final pricing follows site assessment and zone-wise BOQs with exclusions and milestones.
After handover
Establishment watering, seasonal tasks, and replacement thresholds should be scoped before occupancy — not negotiated after snag closure. Our landscape maintenance AMC documents visit cadence, exclusions, and SLA expectations. FM teams can model scope bands with the AMC calculator and read SLA framing in landscape maintenance SLA guide.
Segment pages describe buyer-specific arrival, operations, and risk. City pages cover climate, logistics, and maintenance realities on the ground.
Straight answers on scope routing, contracts, geography, and what to send before a site visit.
Nine commercial pillars: hardscape and civil, softscape and horticulture, irrigation, landscape maintenance AMC, terrace and podium gardens, outdoor lighting, indoor plantation, swimming pool surrounds, and water features. Each pillar page explains scope, specifications, handover, and maintenance implications.
Yes, where programme and FM requirements allow. We align phased execution, snag closure, and handover documentation with an optional AMC — so establishment, irrigation commissioning, and seasonal tasks are not handed to unrelated vendors after occupancy.
Procurement, project management, architects, and FM teams on hotels, corporate campuses, developers, malls, hospitals, and institutions. We are set up for estate-scale programmes, not small residential gardens or plant-only supply.
Use each pillar page for BOQ line items, material specs, exclusions, and commissioning steps. Our procurement guides cover BOQ format, quotation comparison, and RFP checklists — linked from this page — so you can audit apples-to-apples before site assessment.
Yes, pan-India where crew logistics, quality control, and programme phasing support the scope. City pages describe local climate, mobilisation, and maintenance constraints; segment pages describe buyer-specific risks.
Programme dates, location, approximate area or zone list, drawings if available, and whether you need design-build only or AMC after handover. We respond with feasibility, documentation expectations, and the right pillar contacts.

Next step
Share programme, location, and scope band — we route you to the right service pillars and documentation expectations.
Request a site assessment